slab insulation going in

2013 07 29: the picture shows the eight inches of expanded polystyrene insulation being added over the gravel.  code requires only two inches. i should have cozy feet by the end of this project.

eps being installed

eps being installed

Leave a Reply

Your email address will not be published. Required fields are marked *